CTDOT 135-287 · Roadway
Route 106 Intersection Improvement
Less congestion and safer crossings at Route 1 and Hamilton Avenue, Stamford
Project Overview
Less congestion and safer crossings at Route 1 and Hamilton Avenue, Stamford
The Intersection Improvement project in Stamford was developed to reduce traffic congestion and optimize movement along Route 106 through targeted upgrades at Route 1 and Hamilton Avenue.
The improvements focused on roadway efficiency, pedestrian accessibility and stronger supporting infrastructure to meet long-term transportation demand.
Scope of Work
What the project delivered
Traffic flow & intersection upgrades
- Dedicated turn lanes at the Route 1 and Hamilton Avenue intersections
- Intersection modifications for safety and efficiency
- Better traffic circulation
- Safer conditions for motorists and pedestrians
Drainage & infrastructure
- Storm drainage system upgrades
- Improved water management and flood prevention
- Underground utility improvements
- Long-term infrastructure support
Sidewalk & pedestrian enhancements
- New ADA-compliant sidewalks
- Improved pedestrian connectivity
- Safer intersection crossings
- Better public accessibility
Project Impact
The project improved traffic operations along Route 106, reduced congestion and increased roadway safety, supporting Stamford’s ongoing transportation modernization for motorists and pedestrians alike.
Project Gallery
On site
Contact Us
Send Us A Message
Have questions or ready to get started? We’d love to hear from you. Contact our team today for more information about our services, and we’ll get back to you as soon as possible.
- Call203-926-1796
- WhatsAppMessage us
Request a Proposal
Share your project details. You can attach drawings, an RFP or photos. Fields marked * are required.



