CTDOT 0092-0668 · Bridge
Rehabilitation of Bridge No. 3039
Extending the life of critical transportation infrastructure in New Haven
Project Overview
Extending the life of critical transportation infrastructure in New Haven
Bridge No. 3039 in New Haven underwent comprehensive rehabilitation under CTDOT Project 0092-0668 to improve structural performance, safety, and long-term durability.
With construction exceeding $6 million, the project included extensive upgrades across structural systems, deck improvements, protective treatments, and drainage enhancements to meet modern transportation standards.
Scope of Work
What the project delivered
Structural repairs
- Concrete repairs across substructure and superstructure
- Steel rehabilitation for improved durability
- Replacement of existing structural components
- Upgraded pin and hinge assemblies
Superstructure enhancements
- Removal of existing steel paint
- Protective anti-corrosion coatings
- Bearing replacements for better load transfer
- Improved bridge movement performance
Substructure & drainage
- Concrete stabilization work
- Cleaning and extension of drainage systems
- Improved water management
- Reduced long-term maintenance
Project Impact
The rehabilitation improved structural integrity, increased operational safety, and extended the service life of the bridge, improving reliability for vehicle and pedestrian traffic throughout New Haven.
Contact Us
Send Us A Message
Have questions or ready to get started? We’d love to hear from you. Contact our team today for more information about our services, and we’ll get back to you as soon as possible.
- Call203-926-1796
- WhatsAppMessage us
Request a Proposal
Share your project details. You can attach drawings, an RFP or photos. Fields marked * are required.



