CTDOT 126-172 · Bridge
Derby–Shelton Bridge Improvements
Restoring a 1918 river crossing for drivers, walkers and cyclists
Project Overview
Restoring a 1918 river crossing for drivers, walkers and cyclists
The Derby–Shelton Bridge, a historic structure originally built in 1918, underwent major improvements under DOT Project 126-172. The project focused on modernizing transportation infrastructure while preserving the bridge’s architectural identity.
Through upgraded roadway systems, enhanced pedestrian access, and aesthetic restoration, the project strengthened safety, accessibility, and connectivity between downtown Derby and Shelton.
Scope of Work
What the project delivered
Pedestrian & cyclist enhancements
- Expanded pedestrian plaza for safer public access
- Bi-directional cycle track on the south side
- Improved connectivity to the Derby Greenway
- Enhanced access to the Shelton Riverwalk
Structural & aesthetic renovations
- Deteriorated parapet walls replaced with historically accurate replicas
- Decorative railings installed
- Period-style lighting fixtures added
- Historic identity kept while improving appearance
Roadway improvements
- Roadway reconfigured with an additional eastbound lane
- Improved traffic movement and accessibility
- Full-depth pavement replacement
- Upgraded intersections connecting Route 34 and Route 110
Project Impact
This revitalization restored an important transportation corridor while creating a safer and more accessible environment for pedestrians, cyclists and vehicles, and strengthened mobility between Derby and Shelton.
Contact Us
Send Us A Message
Have questions or ready to get started? We’d love to hear from you. Contact our team today for more information about our services, and we’ll get back to you as soon as possible.
- Call203-926-1796
- WhatsAppMessage us
Request a Proposal
Share your project details. You can attach drawings, an RFP or photos. Fields marked * are required.








